Home | Page2 | Page3 | Page4 | Page5 | Page6 | Page7 | Page8 | Page9 | Page10 | Documents

 

 

Plans, Documents and Drawings
     
  SIRMA (Сърма) - Bulstat Certificate

Skika

AKT14/1 - AKT14/2

Permission to Build - Building 1

Permission to Build - Building 2

Septic Tank

Water Meter shaft

Plumbing Pipes/Cable Routing

Cellar/Basement

First floor electrical installations

Second floor electrical installations

Loft lightning protection system

Lightning protection system

Electrical metering and building panels, line diagram

Low voltage systems - first floor

Low voltage systems - second floor

External plumbing connections

 

 

 

Buildings No1 and No2

Basement electrical installations - basement distribution

Building No2 - first floor

Building No2 - second floor

Building No2 - vertical section A-A

Building No2 - vertical section B-B

Furnished second floor

 

EVN - Change name on Contract - PDF

EVN - Change name on Contract - JPG